This presentation presents UFAD concepts, common issues, and Lessons Learned during Cx of UFAD Systems. It will provide a very brief review of basic design concepts, applications & benefits followed by the common issues observed during design, construction & operation phases of UFAD project delivery. The conclusion provides a pictorial review of a typical UFAD construction project.
1. Design Concepts
2. Applications & Benefits
3. Cx UFAD Systems: The HIT List
4. Pictorial Review of UFAD Construction
Center for the Built Environment Case Study – CBE UFAD Sound Transmission Case Study
CBE Berkley Additional UFAD resources – CBE Berkley Case Studies & additional research
ASHRAE UFAD Design Guide – ASHRAE Bookstore

 

Cx UFAD

Next Generation Commissioning for Smart Energy Buildings

Presented for UNI Strategic in Singapore – February 19-21, 2014

Download LinkPresentation SummaryPresentation OutlineReferences
This presentation is part of a 3 day training course, that considers the primary goals of the commissioning processes for new construction, but also explores the activities and roles of re-commissioning for existing buildings that have already been commissioned, retro-commissioning for buildings, that had not yet been commissioned, and the energy saving concepts of continuous commissioning.
At the end of this session, participants will be able to:
1. Recognize the various applications of Commissioning processes as part of the best practices for building owners and facility managers.
2. Incorporate the commission process in a successful design and construction approach.
3. Specify the key steps and tools used in the total building commissioning process.
4. Transition from the current design-build-supervise process to the commission process.
5. Adopt continuous commission process principles for the benefit of your organization
Building Commissioning Association
American Commissioning Group
ASHRAE

 

HVAC Energy Saving Strategies

HVAC Energy Saving Strategies for Sustainable Cx Projects

Presented for IFMA at Pierce College – April 2012

Download LinkPresentation SummaryPresentation OutlineReferences
This presentation was part of a multi-series of featured topics used as a training/awareness course provided by IFMA San Fernando Valley Chapter, that explores the energy saving concepts of various HVAC Control Strategies and illustrates how commissioning is an integral part of energy efficient HVAC operation and energy saving strategies.
1. Energy Recovery
2. Dedicated Outdoor Air Treatment
3. Demand Control Ventilation
4. Static Pressure Reset
5. Economizers
6. Supply Air Temperature Reset
7. Commissioning HVAC Systems for Optimum Performance
Building Commissioning Association
American Commissioning Group
ASHRAE

 

Code & Regulated Cx References

constructionContent Under Construction, please come back soon.

 

Cx Best Practices

constructionContent Under Construction, please come back soon.

 

Cx Focused Design Review Guidelines

constructionContent Under Construction, please come back soon.

Thank you for visiting our Library Page!

Testimonials

“I highly recommend James as a LEED Commissioning Agent for any project you may envision. He will provide you with excellent and very complete service.”
Steven FellerPE